Building your first home is exciting, and let’s be honest, it can feel like a long wait when so much happens before the first wall goes up. At McDonald Jones Homes, we guide you through every step across Australia, from your first design chat to the day we hand you the keys. Knowing the stages of building a house means you’ll always know what’s happening on site, what we might need from you and why some parts take a little longer than others. Here’s how your new home comes to life.
Think of your build schedule as a roadmap. It sets out the expected order of work, though site conditions and trade timing can nudge individual dates. We’ll keep you updated along the way, so you can plan ahead for upcoming decisions and never have to guess what’s next.
Home. Made Webisode | The MyChoice Design Studio experience with Jennie Princehorn
Planning, design and approvals
It all begins with the fun part: choosing a floor plan, a facade and the inclusions that suit your household. We’ll also take a good look at your block, because its slope, access, soil and available services all shape the work needed before construction starts.
Before you sign your contract, we confirm your design and site details and note anything that could affect price or approvals down the track. Your contract sets out the agreed scope, allowances and expected build time, and your plans then head through the relevant approval process, whether that’s council, a private certifier or other authorities. These early home construction steps are mostly paperwork, but they save you from costly surprises once the trades are booked.
This is also the perfect moment to picture life in your new home. Think about where the couch will go, how much storage you’ll need, how the driveway will run and where you’ll enjoy the outdoors. Changes after contracts or approvals can take time and affect cost, so speak up early and we’ll happily talk it through.
Home. Made Webisode | Virtual construction tour
Site works and the slab
Once approvals are in hand, we get your block ready. Our crews may clear vegetation, set up safe access, level the land and arrange temporary services, then excavate to suit the engineering for your home and the ground beneath it.
Pouring the slab is a big milestone. Before the concrete goes down, we check the steel reinforcement, plumbing set-outs and formwork, then allow plenty of time for it to cure properly. It’s the foundation for everything that follows, and accurate set-outs now mean a smoother run for the internal trades later. Weather and ground conditions can influence timing, especially after heavy rain.
Throughout, your site supervisor checks the work against the approved plans and engineering details, making sure drainage, levels and service locations are spot on before the next trades arrive. It might look quiet while the concrete cures, but that patience gives you a strong, stable base for the home above.
Frame and lock-up
Frame stage is when your house starts to look like a home. Our carpenters raise the precision engineered Supaloc wall frames and roof structure made from Australian Made Truecore Steel. The roof covering and external wall materials soon follow to shield the build from the weather. Electrical and plumbing rough-ins are coordinated as the structure takes shape.
Then comes lock-up, when the external doors, windows and roof are in place and your home is a secure shell. It’s an exciting moment, though there’s still plenty to do inside. Many buyers ask how long after lockup to handover, and the answer depends on your design, trade availability, material lead times and the weather. Linings, cabinetry, tiling, paint and final services all need to happen in the right order.
With the building better protected from rain and wind, internal trades can get to work with fewer interruptions. Your supervisor keeps deliveries and access running smoothly so materials arrive just as each room is ready. A larger home, or one with detailed finishes, may need a little longer after lock-up than a simpler design.
Internal work and selections coming to life
After lock-up, the plasterboard goes up and your rooms take shape. Wet areas are waterproofed before tiling, and cabinets, internal doors, skirting and architraves are fitted as the trades return to site. This is where your selections come to life, from kitchen finishes to tapware and storage.
These home construction steps rely on careful sequencing. A benchtop can’t go in before the cabinetry is ready, and floors need protecting from later work, so we coordinate every trade around those dependencies. Some materials are ordered well ahead, particularly those with longer supply times, so the decisions you make during planning keep paying off here.
Wet areas get special attention because waterproofing must cure before tiles and fittings go in. Painting takes time too, with surfaces checked and coated across several visits. Keeping the trades in the right order protects your finished surfaces and avoids reopening completed work.
Fit-out, checks and final details
Now for the finishing touches. Basins, toilets, taps, switches and light fittings are installed while our painters complete the walls, ceilings and trim. Flooring, shower screens and appliances follow in line with the build schedule. Small adjustments are normal at this point as every item is checked against your plans and selected inclusions.
Formal inspections take place at required points during construction, and we complete our own internal quality checks before practical completion. It’s no rushed last look. We review the finishes, test the fittings, check each completed room and attend to anything that needs it. You’ll then be invited to a pre-handover appointment to walk through your finished home and ask questions about its features.
Bring a short list of questions, such as how to operate your appliances, ventilation and any other equipment supplied with the home. It’s also a great time to confirm the next steps for settlement and key collection. We record any outstanding items and work through them before handover where required.
Handover and warranty support
Handover is the big day, when you receive the keys and step from building plans into home ownership. We’ll give you the documents for your new home, which can include appliance information, care guidance and warranty details. Keep them somewhere safe, as they’ll come in handy for maintenance down the track.
So, how long after lockup to handover? There’s no single answer, because the remaining work is detailed and depends on the trades. Your construction team will keep you updated as your home nears completion and final inspections are finished. McDonald Jones Homes has built for 39 years, and our warranty support gives you a clear point of contact once you’ve moved in. Understanding the full journey helps every milestone feel easier to follow, and lets you approach handover with realistic expectations.
Once you’re settled in, follow the care information provided for your surfaces, appliances and wet areas. If a warranty matter comes up, contact us through the recommended process with clear details and photos where helpful. Keeping a record of maintenance and correspondence makes any future query simple.
Talk to our team about your new home
Ready to talk about your first home in NSW or the ACT? Contact McDonald Jones Homes online through our Contact Us page to request a quote or chat with our team. You can also call 1300 555 382.
We’ll talk through your preferred design, your block and the first steps towards a contract. Bring along any site information you already have, and we’ll help you work out what to discuss next.